140 Hours Available This Month

Controls
Engineering.
On Demand.

PLC, HMI and electrical design capacity for machine builders, integrators and OEMs — added to your team for the length of a project, without a permanent hire.

Client owns IP and sourceISA-88 / PackML Standard

Reserve Engineering

Live Status
Available Capacity140 Hours
Target Response< 15 Mins
Instant MNDA ProtectedDirect Sr. Engineer Contact

Capabilities

Inside the panel

Capacity Estimator

Calculate your engineering capacity

40hrs
10160

Turnaround

7business days

Overhead saved

$21,500vs. full-time hire

Assigned

Controls engineer

Included

  • Complete PackML / ISA-88 modular PLC source code
  • Comprehensive I/O mapping & fieldbus diagnostics
  • Offline logic emulation & factory simulation files
  • Commented ladder / ST tags and revision logs

MNDA on request · client owns the IP

Comparison

Why on-demand

01 // TIME-TO-ONBOARD

01/05

Time-to-Onboard

Traditional

Full-time hire
3 to 6 Months (Hiring + Recruiting)
Agency
2 to 4 Weeks (SOW Negotiation)

XL Controls

Under 24 hours

02 // COST-MODEL

02/05

Cost Model

Traditional

Full-time hire
$140k–$170k Salary + Benefits + Overhead
Agency
$180–$250/hr + Retainer Lock-in

XL Controls

Hourly, project, or weekly capacity

03 // PLATFORM-COVERAGE

03/05

Multi-Platform Coverage

Traditional

Full-time hire
Limited to single engineer's background
Agency
Junior engineers assigned to your account

XL Controls

Ladder, ST and FBD across AB, Siemens, Beckhoff, Emerson GE

04 // OVERHEAD-IDLE

04/05

Overhead & Idle Time

Traditional

Full-time hire
Paid 100% even during project slowdowns
Agency
Minimum billable hour thresholds

XL Controls

Billed only for hours worked; pause between phases

05 // CODE-STANDARDS

05/05

Code Quality & Standards

Traditional

Full-time hire
Varies; often unstandardized code
Agency
Often uses proprietary black-box blocks

XL Controls

Open, modular source to PackML and ISA-88

Portfolio

Proven field results

Remote Controls Optimization

25% Throughput Increase — Online PLC/HMI Optimization

Allen-Bradley PLCsPLC / HMI ProgrammingRemote Commissioning

Challenge: Customer required additional machine throughput, but increasing speed without first validating the existing electrical and controls hardware could introduce reliability or equipment-limit issues.

Solution: Performed a thorough hardware and controls review to verify the machine could safely support the increased operating rate. After validating the system, implemented PLC and HMI code changes remotely while the machine remained online, optimizing machine sequencing and operating parameters.

Throughput

+25%

Modification

Remote, online

Hardware

Validated

Legacy Machine Retrofit

Two PLCs Integrated Into One + New Conveyor System

GE / Emerson PLCAutoCAD ElectricalControls Retrofit

Challenge: A repeat machine required significant controls changes from the previous design. The system was transitioning from a two-PLC architecture to a single PLC while also incorporating additional conveyors, including equipment that had not previously been used on the platform. The customer needed the original machine specifications maintained without redesigning their process requirements.

Solution: Reworked the existing controls architecture and manually configured the new conveyor equipment to match the required specification. Integrated the new hardware into the legacy electrical design through PLC programming, AutoCAD Electrical modifications, and controls/hardware integration.

Architecture

2 → 1 PLC

Conveyors

Integrated

Specification

Unchanged

First-of-Kind System Design

Ground-Up Controls & Electrical Architecture

Allen-Bradley PLCsStratix 5700 / PointMax I/OSiemens Power Supplies + Servo Systems

Challenge: The company had not previously built this system architecture: a material-handling system designed to move cartridges from a palletized zone, depalletize the product and boxes, and feed them into an inspection process. There was no existing electrical design to simply reproduce.

Solution: Developed the control-panel and electrical architecture from the ground up, including power distribution, panel layout, I/O architecture, schematics, and BOM development. Integrated multiple hardware platforms into a cohesive controls system, including Allen-Bradley PLCs, Stratix 5700 networking, PointMax I/O, servo systems, and Siemens power supplies.

Electrical

Ground-up

Integration

Multi-platform

Architecture

First of kind

Getting started

Start with a scope review

Twenty minutes with the engineer who would do the work. Bring a bottleneck, a set of schematics, or a date you are not going to hit.

No charge and no obligation. The output is an honest read on whether this is work we should be doing for you.

Where the schedule is actually stuck
Platform, current code state, drawing package, and the constraint behind the delay.
Whether we are the right fit
If the work sits outside Rockwell, Siemens, Beckhoff, Emerson GE or AutoCAD Electrical, we will say so rather than take it.
A rough shape, not a proposal
An hour band and a sequence you can use with us or with anyone else.

Scope Fulfillment Guarantee

If the final deliverable fails to meet the explicitly agreed-upon and signed-off project scope, we will execute the required rework at zero additional billable hours.

Scope is documented before work starts and signed off by both sides. Changes requested after that point are quoted as changes, not absorbed as rework.

Rework means bringing the delivered work in line with that document — not extending it.

* Applies strictly to the originally documented project scope. See our standard MSA for full terms and conditions.

Onboarding

From call to commissioning in 24 hours

Direct Engineer Contact

Speak with the controls engineer doing the work, not an account manager.

Redline Drawing Audit

Rapid review of electrical schematics and panel layout specifications.

Response Window

Defined response times during core manufacturing shift hours.

FAQ

Questions, answered

For emergency support or active overflow engineering, we can review your electrical schematics/PLC code and start within 24 hours. Standard project capacity reservations are typically finalized in 1 to 2 business days.